- Joined
- 13 Mar 2021
- Messages
- 31
- Reaction score
- 0
- Country
Good afternoon all
I'll be tiling my bathroom soon.
I have ordered 500×250 tiles. On one wall I want the tiles to be vertical and the joining wall horizontal. However using tile spacers will make the 2 horizontal tiles overlap the vertical one throwing out the grout lines. Is there a way around this other than using extra thick grout lines on the vertical tiles, which I don't think will look nice.
Also. I have brought the mapei standard set adhesive to give me plenty of work time. Can I use this on the areas of the wall where the shower is? Or do I need the waterproof adhesive?
Thanks
I'll be tiling my bathroom soon.
I have ordered 500×250 tiles. On one wall I want the tiles to be vertical and the joining wall horizontal. However using tile spacers will make the 2 horizontal tiles overlap the vertical one throwing out the grout lines. Is there a way around this other than using extra thick grout lines on the vertical tiles, which I don't think will look nice.
Also. I have brought the mapei standard set adhesive to give me plenty of work time. Can I use this on the areas of the wall where the shower is? Or do I need the waterproof adhesive?
Thanks