Should I run the 2nd rose back to the "primary" switch, or can I piggy back it of the existing rose?
I can do either option easily as its only a short distance between primary switch and 1st ceiling rose, I'just don't know which is the way to do it.
Urgent as I have plasterer coming tomorrow so need to run cables now if going back to switch!
many thanks
I can do either option easily as its only a short distance between primary switch and 1st ceiling rose, I'just don't know which is the way to do it.
Urgent as I have plasterer coming tomorrow so need to run cables now if going back to switch!
many thanks