Our chimney breasts have been removed and gallow brackets installed in the loft, the existing stack is in desperate need of repair at the moment there are no pots and a few bits of slate have been badly cemented on to cover the flue holes.
I was thinking of raking out and re-pointing the stack and maybe bedding on a concrete slab cut to the right size.
Or should i put a couple of pots back on and fill them with chicken wire or cement?
What ever i do should i vent whats left of the flues or seal them?
Thanks for reading.
I was thinking of raking out and re-pointing the stack and maybe bedding on a concrete slab cut to the right size.
Or should i put a couple of pots back on and fill them with chicken wire or cement?
What ever i do should i vent whats left of the flues or seal them?
Thanks for reading.