hi,
I'm about to fill my cavity today all around for my conservatory dwarf wall to 225 below dpc.
I have dropped the inner course of bricks down around where the doors are going. My question is does the infill need to be brought unto that level at the Same time as filling the cavity or can I fill it first and then do it at a separate stage?
I'm not sure how easy it will be to do in one as its only brought up in those places.
I would prefer to do it later unless it's not advisable due to cracking etc but I expect it's highly unlikely. I need to adjust the position slightly but needed to fill the cavity today really.
Thanks
I'm about to fill my cavity today all around for my conservatory dwarf wall to 225 below dpc.
I have dropped the inner course of bricks down around where the doors are going. My question is does the infill need to be brought unto that level at the Same time as filling the cavity or can I fill it first and then do it at a separate stage?
I'm not sure how easy it will be to do in one as its only brought up in those places.
I would prefer to do it later unless it's not advisable due to cracking etc but I expect it's highly unlikely. I need to adjust the position slightly but needed to fill the cavity today really.
Thanks
Last edited: