Watec2E

Joined
18 Feb 2007
Messages
33
Reaction score
0
Location
Surrey
Country
United Kingdom
Has anybody ever heard of Watec2E? I was advised to get some and lay it before tiling the floor. Apparently it is a very good "movement mat" that helps to dampen out some of the movement in the plywood. Anybody used it? All I can find on the internet are German pages. Not sure about the cost or anything yet. I was just curious to se if anybody has any more info on it

Cheers
 
Sponsored Links
There shouldnt be any movement in the plywood, the floor should be solid before tiling.
 
A translation by Google of the German page you mention;

Short description:

- reinforced carrying system for ceramic tiles in the internal area, shifted in the Dünnbett

- aired out and decouples the ceramic lining of critical underground

- Areas of application (inside):

- Wood and mixing undergrounds

- contaminated undergrounds

- young still shrinking Zementestriche

- Anhydrite floors



Sounds like a de-coupling layer to me. If you screwthe plywood down at the specified centres and your joists are secure enough then there shouldn't be any movement in your plywood. Worked for me. ;)

PP
 
Sponsored Links

DIYnot Local

Staff member

If you need to find a tradesperson to get your job done, please try our local search below, or if you are doing it yourself you can find suppliers local to you.

Select the supplier or trade you require, enter your location to begin your search.


Are you a trade or supplier? You can create your listing free at DIYnot Local

 
Back
Top