- Joined
- 29 Sep 2019
- Messages
- 46
- Reaction score
- 3
- Country
Triffle are you saying the lower cable going through the doorframe is going outside and is the supply coming in.
If so then i was getting mixed up, I wrongly asumed that new cable went to thenewer cut out, maybe they renewed your supply to there for some reason.
Just noticed the left what i thought was a Henley box is actually joined to the fuse, so that makes that a "Cut out " with a seperate Henley block for the Earths, my apologies
Yep the cable lower right is coming in from outside, through the doorframe as you say. And thanks for the extra info (I hadn't noticed myself that the left box was joined to the fuse!)
To clarify:
Looking at my other photos, I've just noticed... is that the split concentric coming into the top of the Henley Cut Out next to the consumer unit? It is all beginning to come clear...: