I've had to rip up the tiles in the utility room to replace a leaking pipe. The floor is concrete them with a thick layer of screed or something, about 2.5cm deep. With the tiles immediately on top of this.
As I need to fit new tiles on top at the right height, what is the stuff that they are laid on? Or what should I use this time?
I'll put photos up now in the next post
Thanks
As I need to fit new tiles on top at the right height, what is the stuff that they are laid on? Or what should I use this time?
I'll put photos up now in the next post
Thanks