Greetings to Everyone,
In the course of renovating my bathroom thanks to some dodgy tiles/plasterboard I've discovered the Shower is being fed on a 6mmsq Cable.
The route is as follows:
0.7m Clipped to a plasterboard wall inside a cupboard
1.7m Floor Void
1.5m Inside a Stud wall (with about 0.5m of 20mm Conduit)
0.5m Stud wall between Switch Isolator & Shower
Should this cable run have been in 10mmsq?
Many thanks for reading this far
Rusty Scot
In the course of renovating my bathroom thanks to some dodgy tiles/plasterboard I've discovered the Shower is being fed on a 6mmsq Cable.
The route is as follows:
0.7m Clipped to a plasterboard wall inside a cupboard
1.7m Floor Void
1.5m Inside a Stud wall (with about 0.5m of 20mm Conduit)
0.5m Stud wall between Switch Isolator & Shower
Should this cable run have been in 10mmsq?
Many thanks for reading this far
Rusty Scot