N
namsag
Ok my real name isnt Andy its cuthbert but you try growing up in a scheme in glesga with the name cuthbert you just constantly get ripped so i chose the name Andy as a young lad to help me through life .
I take it the boiler is an Ultimate 60FF. If so, pump is wired back to the boiler. not as shown in the Y plan.
wow !! thank you. i can not believe how helpful this forum is
Good, you now admit that your wild accusation was totally wrong and that I always knew that HR cable s required!
That posting was related to already installed boilers which others have fitted which I am called to repair.
I still take the view that HR cable is not easily available in smaller conductor sizes. I would be surprised if it was stocked by Screwfix, Toolstation, Wickes or B&Q which are where many installers and builders buy their bits because its easy to buy from those places compared with Plunb Centre where they walk away when you come in and seriously overcharge if you dont have a PC credit account.
I have never yet seen a problem caused by anyone who has not used a HR cable. The cable supplied ready fitted to some boilers is not marked as HR either nor are internal cables except a few on older boilers just on the fan/APS.
Tony
The micron 60ff also has pump overrun, so I have changed the diagram in my earlier post. The alterations I gave have not changed.I take it the boiler is an Ultimate 60FF. If so, pump is wired back to the boiler. not as shown in the Y plan.
is this correct ? how can i tell ? the boiler doesnt have the word ultimate anywhere on it
just glowworm micron 60ff
If you need to find a tradesperson to get your job done, please try our local search below, or if you are doing it yourself you can find suppliers local to you.
Select the supplier or trade you require, enter your location to begin your search.
Are you a trade or supplier? You can create your listing free at DIYnot Local