Hi all
I am planning this year on extending into the existing outbuilding like all of neighbours have done.
I have a couple of questions for you good folk.
The tasks that need to be done are.
Install new back door
Remove slate from roof and rebattern felt and I believe insulate before plastering.
Install RSJ
New waste pipe I same location as existing soil pipe, I think, current one is from outside toilet and will become the inside toilet.
Dig out floor and install new floor half is suspended timber and half is currently about 2 inch cement covered in brick and then inside bit has tales over the top.
New stud walls I believe with insulation on any external walls.
My question is that this will prob take all year working on it step by step.
Would it be better for my builder to apply for the building regs all at once or at each step?
Does each application cost?
Is there a time limit on each step?
I only ask as I will do each step bit by bit when I afford each step.
Tanks all for any input
I am planning this year on extending into the existing outbuilding like all of neighbours have done.
I have a couple of questions for you good folk.
The tasks that need to be done are.
Install new back door
Remove slate from roof and rebattern felt and I believe insulate before plastering.
Install RSJ
New waste pipe I same location as existing soil pipe, I think, current one is from outside toilet and will become the inside toilet.
Dig out floor and install new floor half is suspended timber and half is currently about 2 inch cement covered in brick and then inside bit has tales over the top.
New stud walls I believe with insulation on any external walls.
My question is that this will prob take all year working on it step by step.
Would it be better for my builder to apply for the building regs all at once or at each step?
Does each application cost?
Is there a time limit on each step?
I only ask as I will do each step bit by bit when I afford each step.
Tanks all for any input