B
Bamber gaspipe
Only have wiring diagram in front of me..2 connections..one to overheat stat..one to flue overheat stat & then down to pcb..
yeah your right ive just found the wiring diagram. in that case if the APS is working correctly then check your oH stat and Fan OH stat for continuity as may well be one of these.Bamber gaspipe said:Only have wiring diagram in front of me..2 connections..one to overheat stat..one to flue overheat stat & then down to pcb..
chrishutt said:Testing the APS is quite simple if you identify the APS lead connections on the PCB and use a multimeter to check for switching.
chrishutt said:Testing the APS is quite simple if you identify the APS lead connections on the PCB and use a multimeter to check for switching.
ChrisR was just trying to explain that to you, after I'd given up. Look, to be frank, I get the feeling that this electrics lark is not your thing. Perhaps you'd best get an electrician or boiler engineer in.Bamber gaspipe said:...Still don`t know how Chrishutt checks with multimeter..
Don't tempt me!Bamber gaspipe said:.to be frank you haven`t yet told me where to place multimeter.
If you need to find a tradesperson to get your job done, please try our local search below, or if you are doing it yourself you can find suppliers local to you.
Select the supplier or trade you require, enter your location to begin your search.
Are you a trade or supplier? You can create your listing free at DIYnot Local