Had to replace / clean cold feed pipework due to a build up of magnetite from header tank through 15mm to 22mm tee.
So, looking at giving the system 4-6 weeks of X400 before flushing then adding X100. However, I’m in a bungalow with all the pipework under a subfloor feeding five rads (except the boiler feed / return, and cold feed which are in the loft).
I’m assuming to clean the under-floor pipework which sits lower than the rads, I will need some form of pressure cleaner, or will the X400 eventually be pumped through. Also, how will the x400 clean the rest of the cold feed pipework?
So, looking at giving the system 4-6 weeks of X400 before flushing then adding X100. However, I’m in a bungalow with all the pipework under a subfloor feeding five rads (except the boiler feed / return, and cold feed which are in the loft).
I’m assuming to clean the under-floor pipework which sits lower than the rads, I will need some form of pressure cleaner, or will the X400 eventually be pumped through. Also, how will the x400 clean the rest of the cold feed pipework?