I'm due to attend a testing and inspection course but would like a bit of prior knowledge.
Loop impedance Ze, where exactly is it to be measured? Is it at the earth terminal of a DB? Do I have to disconnect any earth connections to pipework, steel framework etc? So the reading is purely the cable.
Zs, similar question.
R1+R2. I believe it is the resistance reading of the phase and earth conductor in series. What is done with 3 phase work. Are 3 seperate readings required?
PFC. Where is that measured? At the furthest point or at the DB earth terminal?