Five of us are off to ireland next week to refurb an old Bungalow (painting, tiling, new bathroom etc). It needs an Electric oven/hob & a shower installed.
I havent seen the bungalow yet & dont know the setup on the electrical side. What I was planning on doing was putting in an additional 3 or 4 way CU & running the shower (on a RCBO) & oven/hob off that. What do you reckon ?
I know the original CU might not be up to it but I have to assume it is at the moment & I need to get all the materials over here & take with us & I cant take everything.
I havent seen the bungalow yet & dont know the setup on the electrical side. What I was planning on doing was putting in an additional 3 or 4 way CU & running the shower (on a RCBO) & oven/hob off that. What do you reckon ?
I know the original CU might not be up to it but I have to assume it is at the moment & I need to get all the materials over here & take with us & I cant take everything.