l'm fitting a 900x900 quadrant shower tray and could do with a bit of advice. The quadrant tray is going on a raised plyboard plimth and the walls are tiled just leaving the bottom row of tiles missing at the moment.Do l put the tray down and tile onto the tray or tile down and put the tray up to the tiles.
If l sit the tiles onto the tray will it make it hard to fit the enclosure as a few mm on each side of the tray would be tiled if you see what l mean...
Also as the quadrant base is going straight onto plyboard do l need to put anything under the tray(silicone or mortar) if so why.
Do l need to put anu silicone onto the tray sides before fitting to the wall or tiles ..
If l sit the tiles onto the tray will it make it hard to fit the enclosure as a few mm on each side of the tray would be tiled if you see what l mean...
Also as the quadrant base is going straight onto plyboard do l need to put anything under the tray(silicone or mortar) if so why.
Do l need to put anu silicone onto the tray sides before fitting to the wall or tiles ..