Building an extension (my own) and the BCO has mentioned the "part P certificate" that's required before he'll issue completion certificate.
Bearing in mind the extension involves no additional circuits, no kitchen, no work within the bathroom zones specified in part P as "notifiable", and will consist only of adding two or three lights, and adding some sockets on existing rings, I would prefer to do this work myself as I've done many times in the past a s non-notifiable work.
Therefore am I right in saying the BCO should not require any certificate as the electrical work is non-notifiable under part P?
Appreciate there's a lot on here about part P already which I have looked through, but any advice on whether I've got the above right would be much appreciated.
Cheers
Sam
Building an extension (my own) and the BCO has mentioned the "part P certificate" that's required before he'll issue completion certificate.
Bearing in mind the extension involves no additional circuits, no kitchen, no work within the bathroom zones specified in part P as "notifiable", and will consist only of adding two or three lights, and adding some sockets on existing rings, I would prefer to do this work myself as I've done many times in the past a s non-notifiable work.
Therefore am I right in saying the BCO should not require any certificate as the electrical work is non-notifiable under part P?
Appreciate there's a lot on here about part P already which I have looked through, but any advice on whether I've got the above right would be much appreciated.
Cheers
Sam