- Joined
- 25 Feb 2017
- Messages
- 25
- Reaction score
- 1
- Country
I currently have a 13A fused spur that supplies power to my shed. This would have been done at a time that predates current standards, and as I've now replaced the shed (but kept the existing supply), I'd like to add some sockets and modernise it where I can without having to run a new supply.
Currently it's as follows:
https://electrical.theiet.org/media...tdoors-a-supply-to-a-detached-outbuilding.pdf
My understanding is that it's not notifiable because the existing supply predates current standards, but I obviously want it to be safe, so I'll likely complete the cabling in the shed from the isolator switch onwards, then get a pro to verify it before making it live.
Does the diagram attached seem sensible?
Currently it's as follows:
- 13A fused spur -> conduit to shed -> junction box ->
- 5a switched spur -> light
- double socket
https://electrical.theiet.org/media...tdoors-a-supply-to-a-detached-outbuilding.pdf
My understanding is that it's not notifiable because the existing supply predates current standards, but I obviously want it to be safe, so I'll likely complete the cabling in the shed from the isolator switch onwards, then get a pro to verify it before making it live.
Does the diagram attached seem sensible?