Hi All, I'm looking at getting a smart gas meter fitted , BUT.. concerned about the equipontal bonding.
I've looked into routing the earth cable which will be a big job. I was going to do the job before getting the meter.
Am i right in thinking that if they turn up, they'll make a fuss about having the equipontal bonding fitted? or will they just put a sticker on the meter to say it needs doing?