- Joined
- 15 Apr 2018
- Messages
- 268
- Reaction score
- 1
- Country
Hi all
I have just finished building the base for my summerhouse.
It is 4.7 m wide with a depth of 2.4m
It is constructed using 4x2 with a centre joist running left to right in the middle and joists front to back on 500mm centres.
I have just laid it down after fully constructing it ( joints screwed together) and the diaganols are out by about 10mm.
Now to be fair the back row of foundations are not fully finished but I dont think that will make much difference.
Should I be worried about 10mm?
if so how can I cure it.
The frame is sitting on concrete post foundations and wont be screwed to the base .
I was thinking maybe standing it on its end and trying to push one corner and then use some osb to fix it place?
Any help appreciated.
Thanks
I have just finished building the base for my summerhouse.
It is 4.7 m wide with a depth of 2.4m
It is constructed using 4x2 with a centre joist running left to right in the middle and joists front to back on 500mm centres.
I have just laid it down after fully constructing it ( joints screwed together) and the diaganols are out by about 10mm.
Now to be fair the back row of foundations are not fully finished but I dont think that will make much difference.
Should I be worried about 10mm?
if so how can I cure it.
The frame is sitting on concrete post foundations and wont be screwed to the base .
I was thinking maybe standing it on its end and trying to push one corner and then use some osb to fix it place?
Any help appreciated.
Thanks