- Joined
- 13 May 2021
- Messages
- 89
- Reaction score
- 3
- Country
So I've managed to get 2 zone valves plumbed in, one for my CH, one for my UFH. Now on to wiring.
I am using a Worcester Bosch 35cdi combi. Wiring diagram attached.
I have also drawn what I think is the right wiring plan, but would like a little look over help please, anything a miss?
I've excluded a timer as there's no need for it in this case (I think - combi HW), the salus stats themselves have timer setups for CH/UFH
Also wondering what the 2 wires are out of the UFH control centre for the "boiler" on, as the worcester only seems to want 1 wire to tell it to switch on according to its diagram....
Thanks
I am using a Worcester Bosch 35cdi combi. Wiring diagram attached.
I have also drawn what I think is the right wiring plan, but would like a little look over help please, anything a miss?
I've excluded a timer as there's no need for it in this case (I think - combi HW), the salus stats themselves have timer setups for CH/UFH
Also wondering what the 2 wires are out of the UFH control centre for the "boiler" on, as the worcester only seems to want 1 wire to tell it to switch on according to its diagram....
Thanks