    Part plastering

    Ok thanks i can stop panicking now :D
  2. S

    Part plastering

    Hi I have a plumber coming round to hang the boiler on Monday but i want to get the plasterboard wall skimmed before he hangs it. I have a plasterer coming round on Saturday to skim the said wall. The only problem is that not all the room is ready ie: the window reveals aren't finished and...
  3. S

    Need to finish floor - How?

    Hi I'm back :D Having brought all the stuff i needed as per above details i have found that the floor is out by around 10-15mm further into the room. Most of it starts at 75mm when i come off the original floor but is upto around 85-90mm over the far side of the room. Packings were...
  4. S

    Drainage pipework advise

    I wish an hour, It probably did take about an hour to get that far, then i stood there looking at it for the rest of the time trying to think of a way to get around digging the rest :lol: But seriously how will the pipe that is already there be connected when i finally get down there? Glue...
  5. S

    Drainage pipework advise

    I told you i was over thinking it as i have 3 out of 4 of those tools :D Cheers
  6. S

    Drainage pipework advise

    Hi Right having spent the afternoon trying to dig it out (have only got a little hole at the front) i have reached the soil/sand underneath. There is a metal wire going through the concrete at approx 70mm down (see image below). How can i cut that without special tools? I also have the wall...
  7. S

    Drainage pipework advise

    Yes the pipe goes down approx 480mm underground before the bend. Obviously the bigger gradient the better then?
  8. S

    Drainage pipework advise

    The concrete floor that you can see has got to come up about 70mm but will be done with a framework and ply on top so hopefully pipes will run underneath somehow. If not then i will need to channel out around 2 1/2 metres each way for shower/sink and bath. What sort of drop will i need?
  9. S

    Drainage pipework advise

    With foresight i would have visisted the place 2 years earlier before the person that built the extention died. That way i would have known what he had in mind :?
  10. S

    Drainage pipework advise

    Hi Thanks for the replies. I think the soil manifold is the way to go. As for foresight i don't do anything without over thinking it first and is why i post on here. Unfortunately it was there when i brought the place. :wink: Cheers
  11. S

    Drainage pipework advise

    Hi I have a pipe (see image below) that i need to run a toilet, bath, shower and sink into. The toilet will sit just to the right of this pipe and i think it will just come out of the toilet, turn left and then drop down the top so to speak. The sink and shower will also come from the...
  12. S

    Need to finish floor - How?

    Thanks I take it the joists don't need to be bolted down, they will just float so to speak? Also where could i buy the DPM online? So many questions - I'm sorry :oops: Richard
  13. S

    Need to finish floor - How?

    Common sense prevails again :D Would i just nail the joints together? Or use brackets or something. Cheers for the speedy replies
  14. S

    Need to finish floor - How?

    Hi Ok thats fine. Going back to the sleeper joists around the perimeter i understand them but do the other 400mm sleeper joists have to sit on top of the these or just inside those, as if they have to sit on top i don't think there will be enough depth for it all. Can i use the DPM and...
  15. S

    Need to finish floor - How?

    Hi Thanks for the reply. I don't know why i didn't think of doing that :? Will i have to leave any gaps for ventilation? Thanks