Recent content by tilla tech

  1. T

    grade d fire alarm with hush/test/silence button

    Hi Has anyone installed a grade d fire alarm with a remote hush/test/silence button? Looks like most mains/9v battery interconnect optical smoke detectors can't have this option. Any ideas on how to acheive this with 3 core+e cabling. Thanks in advance Tilla Tech
  2. T

    passport signing

    If Gas Safe engineers can sign the photos why can't sparkies.
  3. T

    NIC DI Assesement

    Hi Please find the larger pics on link. Thanks //www.diynot.com/network/tilla%20tech/albums/7232
  4. Untitled

    Untitled

  5. Copper conduit carrying tails to upstairs meter

    Copper conduit carrying tails to upstairs meter

  6. Untitled

    Untitled

  7. Service head

    Service head

  8. T

    NIC DI Assesement

    Thanks for the advice and reassurance. By the way did anyone manage to look at the pics of the main fuse and how its split between shop below and upper flat( where I carried out the work). you can click on the first pic and it will go onto my album which will show the other two pics. I dont...
  9. T

    NIC DI Assesement

    tilla tech wrote: Will I be ok if the smoke alarms are on the lighting ircuit rather than a dedicated one. Taylortwocities If it complies with BS7671, you are OK. I thought it might be one those NIC preferences eg. rubber grommet on metal knockout boxes. tilla tech wrote: Two...
  10. T

    NIC DI Assesement

    Hi, NIC DI assesements coming up soon: Will I be ok if the smoke alarms are on the lighting ircuit rather than a dedicated one. Will the inspector want to see paperwork of mains supply being isolated by DNO for the CU change. Two metered installations are running off one single phase...
  11. T

    LABC insisting on Part P qualified to issue PIR

    But the fact that a building notice was made before the works was started, would that not entitle the householder to ask the council to come and do a final inspection and testing themselves? Also I remember reading somewhere (maybe the ODPM part P website) that if an electrician goes...
  12. T

    LABC insisting on Part P qualified to issue PIR

    I issued the PIR recently, the extension work finished two years ago. Reason I'm asking is that I submitted a PIR for a rewire of a house in Bedford. The original electrician did only the first fix and scarppered , I went and finished it off, issued a PIR and the Bedford Council inspector...
  13. T

    LABC insisting on Part P qualified to issue PIR

    Hi Can the LABC insist that a PIR should be for a whole house, when the reason it is needed is so a building notice completion cert can be issued for an extension. The electrics on the extension were completed, no EIC by an electrician but he absconded when he had fall out with the...
  14. T

    Warmfront/Ideal boiler axis of convenience?

    To all those who suffered from Warmfront ideal boilers. Below is extract from parliamentary questions about Warmfornt. http://www.publications.parliament.uk/pa/cm200809/cmhansrd/cm091016/text/91016w0012.htm Warm Front Scheme Bob Spink: To ask the Secretary of State for Energy and...
  15. T

    Rumbling /vibrating noise on start up of Ideal Isar HE24

    Hi My parents Ideal Isar combi, started playing up earlier this yesterday. It was making a rumbling noise so my mum turned the boiler off then called me. I took along a newly qualified Corgi/Gas Safe friend. Whenever we reset or switched on power, after 3 attempts to ignite, the boiler...