Hi everyone, quick one which I'm struggling to get an answer to, but it could always be my useless searching skills.
Is it okay to have a small section of stud wall (approx 2.0m) supported purely by the chipboard floor it rests on (as it falls between the joists), or should he chipboard be ripped up and noggins be fitted between the joists to support the wall? The wall itself will be screwed together to a larger stud frame (approx 3.0m) which goes at 90 degrees across the joists.
I've already added noggins to the to support the header plate as access was easy via the loft, but there's no real easy way of getting the tongue and groove chipboard up as it goes all over he place including under a current stud wall.
Thanks.
Is it okay to have a small section of stud wall (approx 2.0m) supported purely by the chipboard floor it rests on (as it falls between the joists), or should he chipboard be ripped up and noggins be fitted between the joists to support the wall? The wall itself will be screwed together to a larger stud frame (approx 3.0m) which goes at 90 degrees across the joists.
I've already added noggins to the to support the header plate as access was easy via the loft, but there's no real easy way of getting the tongue and groove chipboard up as it goes all over he place including under a current stud wall.
Thanks.