Is there more than one way?
I've laid cable in like this:
but have seen this:
I'm not really bothered as long as it works and have loads of 3C+E to use up.
Obviously the second diagram using red for all the cables is about as much use a a chocolate teapot for a DIYer.
Thanks.
I've laid cable in like this:
but have seen this:
I'm not really bothered as long as it works and have loads of 3C+E to use up.
Obviously the second diagram using red for all the cables is about as much use a a chocolate teapot for a DIYer.
Thanks.