Hi,
Im in a bit of a dilema where I have done some work but didnt notify LABC.
The work entailed romoving plasterboard ceilings and upgrading the insulation between the joists (some beneath a flat roof dormer). The problem is that the joists/trusses are only 75mm and so ive fitted 50mm Celotex and left a 25mm air gap which is not ideal but its better than no insulation at all. The ceilings are very low already so fitting beneath the joists is not somthing i really want to do. The work is about 75% complete. I have just been informed that removal of ceiling is notifiable.
So the question is do I tell building control and do it by the book, what will happen with regards to work already started.
Im in a bit of a dilema where I have done some work but didnt notify LABC.
The work entailed romoving plasterboard ceilings and upgrading the insulation between the joists (some beneath a flat roof dormer). The problem is that the joists/trusses are only 75mm and so ive fitted 50mm Celotex and left a 25mm air gap which is not ideal but its better than no insulation at all. The ceilings are very low already so fitting beneath the joists is not somthing i really want to do. The work is about 75% complete. I have just been informed that removal of ceiling is notifiable.
So the question is do I tell building control and do it by the book, what will happen with regards to work already started.