I have fitted all the piping for the CH and hot/cold system throughout the house and stopped 1m (ish) short of where i want my boiler.
The gas pipe (i did not fit and was in already) was cut back and is also approximately a metre from where i want the boiler.
All joints are visible and accessible however there are no rads in place due to the whole house getting plastered soon.
Where the boiler is going has been plastered to get the boiler in place but I'm trying to find out the legalities and situation of getting someone in to commission this boiler.
Can someone fit the boiler without the rads being on?! Silly question i feel.....
The gas pipe (i did not fit and was in already) was cut back and is also approximately a metre from where i want the boiler.
All joints are visible and accessible however there are no rads in place due to the whole house getting plastered soon.
Where the boiler is going has been plastered to get the boiler in place but I'm trying to find out the legalities and situation of getting someone in to commission this boiler.
Can someone fit the boiler without the rads being on?! Silly question i feel.....