- Joined
- 4 Jan 2012
- Messages
- 307
- Reaction score
- 6
- Country
Hi guys n girls
We had our planning application approved and a conditional part of the approval was to have frosted glass on the first floor east elevation - only 1 window this side and its in a bathroom so we would be silly OR VERY PROUD OF OURSELVES not to frost it over. Anyway...
Fast forward a year with the extension built and we might have extended it by a meter over what was in the original plan. Since this and a very nosey neighbour we're guessing reported it our local planning officer has said we need to come up with a solution as the plans cant be approved given the end product is different. They suggested we look at section 73 (which doesnt really mean a lot to me) and after a quick Google I noticed another option "S96A".
We havent changed any materials or anything just stretched out what was already on the plan by this 1.4m so am I on to something or is section 73 or something else the way to go? Also has anyone had any experience of this or something simular to help or point me so I can get this resolved? Or even permitted building (on a plan approved building?)
Oh and yes I will sit on the naughty step for what we've done. Thanks!
We had our planning application approved and a conditional part of the approval was to have frosted glass on the first floor east elevation - only 1 window this side and its in a bathroom so we would be silly OR VERY PROUD OF OURSELVES not to frost it over. Anyway...
Fast forward a year with the extension built and we might have extended it by a meter over what was in the original plan. Since this and a very nosey neighbour we're guessing reported it our local planning officer has said we need to come up with a solution as the plans cant be approved given the end product is different. They suggested we look at section 73 (which doesnt really mean a lot to me) and after a quick Google I noticed another option "S96A".
We havent changed any materials or anything just stretched out what was already on the plan by this 1.4m so am I on to something or is section 73 or something else the way to go? Also has anyone had any experience of this or something simular to help or point me so I can get this resolved? Or even permitted building (on a plan approved building?)
Oh and yes I will sit on the naughty step for what we've done. Thanks!