Hi,
I've submitted my building plans to the local council for a single story rear extension. They have come back to me with some bits I need to cover in my application.
Could anyone help me out with what more I could do to cover it?
1. Foundataions (i've stated):
All fonudations to be taken down to a min of 1m or to match the existing house to a suitable load bearing strata. To be inspected & Approved by BC.
They have now asked:A1 Loading:
Please confirm that the size and depth of the proposed foundations will be suitable for the subsoil conditions encountered.
How do I do this?
2. F1 MEANS OF VENTILATION
Background ventilation should be provided to all new habitable rooms with a total free area of 8000mm2.
What should I be writing to address this?
I've submitted my building plans to the local council for a single story rear extension. They have come back to me with some bits I need to cover in my application.
Could anyone help me out with what more I could do to cover it?
1. Foundataions (i've stated):
All fonudations to be taken down to a min of 1m or to match the existing house to a suitable load bearing strata. To be inspected & Approved by BC.
They have now asked:A1 Loading:
Please confirm that the size and depth of the proposed foundations will be suitable for the subsoil conditions encountered.
How do I do this?
2. F1 MEANS OF VENTILATION
Background ventilation should be provided to all new habitable rooms with a total free area of 8000mm2.
What should I be writing to address this?