Hi folks, I have a query regarding notifiable works in the bathroom. Back in April, I had a NAPIT registered electrician in to replace a bulkhead light with downlights and install a bathroom LED cabinet. Due to the low ceiling, one of the downlights is within touching distance when in the bath (around 30cm above the showerhead). He also had to bring a feed in from the lights to the cabinet as there was no power there before. The cabinet is within a zone 2 area as it is within 600mm of the area above the bath.
At the time of fitting, I did ask whether I needed any certification and he said no as it was only adding on to an existing circuit. I didn't receive any certificates and to my knowledge, nothing has been notified to building control. I plan to call him to settle this amicably and get him to certify and notify.
My questions are:
1) What documents should he have provided me with?
2) What should he have done regarding notifiying building control?
3) How do I verify that he has done his bit with regards to notifying control?
At the time of fitting, I did ask whether I needed any certification and he said no as it was only adding on to an existing circuit. I didn't receive any certificates and to my knowledge, nothing has been notified to building control. I plan to call him to settle this amicably and get him to certify and notify.
My questions are:
1) What documents should he have provided me with?
2) What should he have done regarding notifiying building control?
3) How do I verify that he has done his bit with regards to notifying control?