Can somebody help me? I recently had a new bath, sink and toilet installed in my home. I paid him in full but feel things left undone but I live on my own and have no idea whether he has done a good job or not. My queries:
1. is it normal to NOT fix the toilet and sink to the wall/floor?
2. Is it normal to put a temporary pipe outside when he put the new bath in? My plumber undertook 2 jobs at the same time and left my job after fitting this temporary pipe. The tiler subsequently used my new bath to clean his tubs full of grouting and the mixture came out like a waterfall into my back yard area making the all white/grey colour - it looks a mess. He promised to come back and clean it but hasn't yet. Is it normal for tilers to do this or should he have used an outside tap?
3. is it normal to have a leaking stop cock valve after he finished the job? (he never came back to fix it. It does now seem a slow leak but still slow drips).
I have no idea if I have case to get him to come back.
Someone's help would be very much appreciated.
Thank you very much.
1. is it normal to NOT fix the toilet and sink to the wall/floor?
2. Is it normal to put a temporary pipe outside when he put the new bath in? My plumber undertook 2 jobs at the same time and left my job after fitting this temporary pipe. The tiler subsequently used my new bath to clean his tubs full of grouting and the mixture came out like a waterfall into my back yard area making the all white/grey colour - it looks a mess. He promised to come back and clean it but hasn't yet. Is it normal for tilers to do this or should he have used an outside tap?
3. is it normal to have a leaking stop cock valve after he finished the job? (he never came back to fix it. It does now seem a slow leak but still slow drips).
I have no idea if I have case to get him to come back.
Someone's help would be very much appreciated.
Thank you very much.