barkie1 didnt think about if it was roll top so yeah i agree he could of done it if that was the case but sure you wouldnt fit the sink or toilet before its tiled i dont it makes a far better finish after so he would of had to come back to finish it off seems like he couldnt be bothered to finish the job
Dan, sadly it wasn't a roll top. A fairly basic Trojan bath. The sink and toilet were Ideal Standard Alto. Plumber did fit the bath before tiling bathroom and toilet and sink were fitted after wall/floor tiling done. The plumber seemed in a rush throughout the week as he had 2 jobs on the go.
I assume it is normal practice to keep a bath filled with water for 3 days - he did say the reason but can't remember - something to do with levelling??? It was annoying because tiler continued to clean his tubs whilst the bath was full of water and all that dirty gunge just sat in the bath for at least 3 days.