If main equipotential bonding to gas and water supply on a TNC or TNC-S system is less than 10mm does it need to be upgraded?
For example if existing bonding is 4mm does this need to be upgraded, at additional decorating cost to the customer, or is there a way around it?
Mat
For example if existing bonding is 4mm does this need to be upgraded, at additional decorating cost to the customer, or is there a way around it?
Mat