I'm about to start tiling our bathroom and hope someone can help with the following .
We've boxed in our bath (not going to be used as a shower bath), using a 50mm timber frame with sheets of 12mm WBP ply on top.
Before tiling should we prime the ply?
We are using BAL grip (improved formulation) adhesive and we have BAL primer which we are going to put on the newly skimmed plasterboarded walls. Should I use the primer on the ply?
Also, probably a daft question in the shower area we have aquapanel - I take it that doesn't need priming?
Cheers
We've boxed in our bath (not going to be used as a shower bath), using a 50mm timber frame with sheets of 12mm WBP ply on top.
Before tiling should we prime the ply?
We are using BAL grip (improved formulation) adhesive and we have BAL primer which we are going to put on the newly skimmed plasterboarded walls. Should I use the primer on the ply?
Also, probably a daft question in the shower area we have aquapanel - I take it that doesn't need priming?
Cheers