Evening
I need to remove a radiator and the corresponding section of pipework from my CH system to enable my builder to put in a concrete floor.
I can access the pipework under the floor. My plan is to cut the pipes and put a pushfit stop end on until the plumber comes to put in the new pipework.
Is this do-able? The boiler pressure is about 1.5bar so i think it shouldnt be an issue to do this without draining the whole system.
I need to remove a radiator and the corresponding section of pipework from my CH system to enable my builder to put in a concrete floor.
I can access the pipework under the floor. My plan is to cut the pipes and put a pushfit stop end on until the plumber comes to put in the new pipework.
Is this do-able? The boiler pressure is about 1.5bar so i think it shouldnt be an issue to do this without draining the whole system.