I have aquired a nice large lump of carpet from work.(cant get any more)
It was to do the hall only.
But i have a feeling that there may be enough to do the stairs as well (but not the hall, stairs and landing)
If i decide to do the hall and the stairs how would i end the carpet on the top stair?
at the moment the landing carpet folds over the 1st(top) stair vertical and then joins with the stair carpet. This would look a bit silly so should i make the join at the beginning of the landing (see very bad txt drawing below marked by an X)
------------X
]
]
]
I know its probably best that the stairs and landing are done but its really the hall that needs replacing.
Any thoughts?
Thanks
It was to do the hall only.
But i have a feeling that there may be enough to do the stairs as well (but not the hall, stairs and landing)
If i decide to do the hall and the stairs how would i end the carpet on the top stair?
at the moment the landing carpet folds over the 1st(top) stair vertical and then joins with the stair carpet. This would look a bit silly so should i make the join at the beginning of the landing (see very bad txt drawing below marked by an X)
------------X
]
]
]
I know its probably best that the stairs and landing are done but its really the hall that needs replacing.
Any thoughts?
Thanks