Hi All
Looking to replace my existing Boiler (Potterton Kingfisher). Just to give some background ~ Chalet Bungalow ~ 4 beds 3 bath (only 1 actual bath the other two electric showers off, the mains.).
Plus CH which needs to be in 2 zones (part of the house needs heating for a lot longer than the rest. The main zone that requires the longer period of heat is 5 rads (approx (guess) 16000 btu’s and the rest is 7 rads.
The main question is that the last guy I had around to look at it said I can’t put in a Combi because it can’t work with zone valves? Is that right?
Thanks in advance
Mike
Looking to replace my existing Boiler (Potterton Kingfisher). Just to give some background ~ Chalet Bungalow ~ 4 beds 3 bath (only 1 actual bath the other two electric showers off, the mains.).
Plus CH which needs to be in 2 zones (part of the house needs heating for a lot longer than the rest. The main zone that requires the longer period of heat is 5 rads (approx (guess) 16000 btu’s and the rest is 7 rads.
The main question is that the last guy I had around to look at it said I can’t put in a Combi because it can’t work with zone valves? Is that right?
Thanks in advance
Mike