Maybe this is a plastering question but....
I have a new outbuilding that is awaiting the plaster; leaving time for me to carry out the wiring.
My question is what trunking/conduit is best to use so that the there is enough depth to cover with plaster. Also what depth do I need to leave the plasterers to ensure the conduits etc are covered...?
How proud should the boxes be for the light switches, sockets etc
The wall is Breeze (Fen-Light) block with concrete floor.
Does anyone have a ny links on this particular area....
Thanks in advance...
I have a new outbuilding that is awaiting the plaster; leaving time for me to carry out the wiring.
My question is what trunking/conduit is best to use so that the there is enough depth to cover with plaster. Also what depth do I need to leave the plasterers to ensure the conduits etc are covered...?
How proud should the boxes be for the light switches, sockets etc
The wall is Breeze (Fen-Light) block with concrete floor.
Does anyone have a ny links on this particular area....
Thanks in advance...