Hi,
I've got a fairly large ceiling to plaster with a few cracks to mend. The instructions for PVA say to prime with PVA/Water 1:5, once dry apply a second coat 1:3 and then start plastering once it goes tacky. But by the time I would finish the second coat would be dry! Could it be a problem? Just wondering how plasterers go about it.
Many thanks.
I've got a fairly large ceiling to plaster with a few cracks to mend. The instructions for PVA say to prime with PVA/Water 1:5, once dry apply a second coat 1:3 and then start plastering once it goes tacky. But by the time I would finish the second coat would be dry! Could it be a problem? Just wondering how plasterers go about it.
Many thanks.