All done.
Moved 4 spurs back to main worktop area high'ish in 2 corners and 4 spurs remain on the plasterboard partition in a compact grid design with 15mm between each switch - looks ok now.
He wasnt happy but his design was silly. Hes not the electrician - hes one of the builders - he just doing the cuts & boxing positions etc before the QUALIFIED electrician comes and does all the proper stuff so i get my building regs certificate.
The electrician came today and moved an alarm sensor and hes back later to hook up a new consumer unit, wire etc etc. I showed the picture of what was done and he said it was wrong.
Thanks for everyones input.
And im not called Barrat.
Moved 4 spurs back to main worktop area high'ish in 2 corners and 4 spurs remain on the plasterboard partition in a compact grid design with 15mm between each switch - looks ok now.
He wasnt happy but his design was silly. Hes not the electrician - hes one of the builders - he just doing the cuts & boxing positions etc before the QUALIFIED electrician comes and does all the proper stuff so i get my building regs certificate.
The electrician came today and moved an alarm sensor and hes back later to hook up a new consumer unit, wire etc etc. I showed the picture of what was done and he said it was wrong.
Thanks for everyones input.
And im not called Barrat.