me thinks you missed my point!! surely if water is 50" from electric meter and the gas is 25' away but in the same direction then the single cable can still serve both
Because the bond should be made within 600mm of the service entering the building but after the stop tap/ gas meter. So ideally they need to be near each other. In the case that the service are in the same directional route, it would be okay but if they are in different directions, you would use two, to save on material costs.
If you need to find a tradesperson to get your job done, please try our local search below,
or if you are doing it yourself you can find suppliers local to you.
Select the supplier or trade you require, enter your location to begin your search.
Please select a service and enter a location to continue...
Are you a trade or supplier? You can create your listing free at DIYnot Local