Hi
Pouring concrete for my extension footings soon and plan to pour 6 or 7 courses of bricks below dpc.
I can't have a screed as I'm keeping a very thick old layer of concrete so only got room for insulation and slab.
Existing house, dpc is about 2inch below finished floor level, but if I go with finished floor level at same height as dpc ( as per loads of great advice on this forum) it means extension dpc is a but higher than existing house, which I was hoping to just link vertically when doing the brickwork up to damp.
If there's any chance anyone fancies sanity checking the above, it would be much appreciated as always!
Pouring concrete for my extension footings soon and plan to pour 6 or 7 courses of bricks below dpc.
I can't have a screed as I'm keeping a very thick old layer of concrete so only got room for insulation and slab.
Existing house, dpc is about 2inch below finished floor level, but if I go with finished floor level at same height as dpc ( as per loads of great advice on this forum) it means extension dpc is a but higher than existing house, which I was hoping to just link vertically when doing the brickwork up to damp.
If there's any chance anyone fancies sanity checking the above, it would be much appreciated as always!