Hi, part of my extension, I'm gonna be pouring a large pad-stone, about 600x600 wide but about 450mm deep.
I have been told to place some mesh in the bottom of my hole before I fill it with concrete. however I was not to clear on what I needed.
I "think" I need a flat mesh made of metal which is placed in the bottom and then I simply pour the concrete into it.
Can someone verify this is correct?
I have been told to place some mesh in the bottom of my hole before I fill it with concrete. however I was not to clear on what I needed.
I "think" I need a flat mesh made of metal which is placed in the bottom and then I simply pour the concrete into it.
Can someone verify this is correct?