I have just had the floor tiles done in the bathroom/toilet, going to inspect and I am not sure whether I should allow 24 hours for this before I inspect and sign off the work.
Although the tiling glue says 2 hrs to dry out etc.
Does it really matter ?
I have just had the floor tiles done in the bathroom/toilet, going to inspect and I am not sure whether I should allow 24 hours for this before I inspect and sign off the work.
Although the tiling glue says 2 hrs to dry out etc.
Does it really matter ?