Hi,
I am laying a garage base...
I have a path that runs round the side of the house.
I want to use all the space at the side as a car port or garage base.
So...
should I just lay the concrete up to come level with the path?
or
should I dig up the path and lay the whole thing lower?
Laying it lower would be preffered by me as when I sort out the front garden and make into a drive it will be at a gentler angle from the new base to the street.
But digging the path up will be a lot more work.
Laying it to the hight of the existing path will be a whole lot less work as it's half ready but when I come to making the front garden into a drive the angle will be steeper between the new base and the street.
What would you guys do???
see pic's below
I am laying a garage base...
I have a path that runs round the side of the house.
I want to use all the space at the side as a car port or garage base.
So...
should I just lay the concrete up to come level with the path?
or
should I dig up the path and lay the whole thing lower?
Laying it lower would be preffered by me as when I sort out the front garden and make into a drive it will be at a gentler angle from the new base to the street.
But digging the path up will be a lot more work.
Laying it to the hight of the existing path will be a whole lot less work as it's half ready but when I come to making the front garden into a drive the angle will be steeper between the new base and the street.
What would you guys do???
see pic's below