Hi all
Had my boiler serviced this morning and it was pointed out that I don't have any electrical bonding on the gas meter
House is a new build (completed 2022) so initially I just assumed it was something that hadn't been checked/missed and needed to get resolved
However, after reading up on this, there is a PDF from the NHBC that states that PEB isn't required if the incoming gas pipe is plastic (PE) so that's maybe why it hasn't been connected:
https://www.nhbc.co.uk/binaries/con...f-gas-installation-pipework-new-june-2020.pdf
So is it actually required?
Here is a photo of the supply pipe entering the meter box
Advice appreciated
Had my boiler serviced this morning and it was pointed out that I don't have any electrical bonding on the gas meter
House is a new build (completed 2022) so initially I just assumed it was something that hadn't been checked/missed and needed to get resolved
However, after reading up on this, there is a PDF from the NHBC that states that PEB isn't required if the incoming gas pipe is plastic (PE) so that's maybe why it hasn't been connected:
https://www.nhbc.co.uk/binaries/con...f-gas-installation-pipework-new-june-2020.pdf
So is it actually required?
Here is a photo of the supply pipe entering the meter box
Advice appreciated