- Joined
- 9 Mar 2006
- Messages
- 288
- Reaction score
- 5
- Country
I've had a new 28i WB installed and they put a new 22mm pipe from the gas meter up the wall under the floor boards then to the airing cuboard where the boiler is. the pipe from the meter goes upto the ceiling then under the floor boards. I was just going to box that bit of the pipe in but i wasn't sure if it needs a protective sleeve or anything roundd it? All the joints have been sealed by what looks like solder
Thanks
Thanks