I can do whatever its the best solution.
I'm reckoning on cutting 2 x 25mm deep 30mm wide chase into the slab with my wall chaser. Then 25mm plastic conduit in one for ring main and 22mm pvc copper for the hob in other. Then the ufh can just float over it