Gravel area and pathway

Joined
3 Nov 2005
Messages
466
Reaction score
4
Location
Liverpool
Country
United Kingdom
I have a small area side of the house im looking at putting gravel down and also a small pathway leading up to the shed with gravel surrounding the path.

My plan is to dig everything up and level off as best i can. Drive some pegs in and fill with 50mm or so of Type 1 MOT. Compact and make sure all is level before laying a weed membrane . Should this be done before the Type 1.

Then lay the slabs /paving i want with a mortar mix. Then to finish off, infill with pea shingle to the slab level.

Does this sound about right? Is it ok to mortar straight onto the Type 1 MOT.
 
Sponsored Links
Your mot would be better at 75mm thick.

Yes lay your mortar bedding direct onto the mot.

Your gravel would ideally be around 50mm deep so
Depending on the flags used 25-50mm +bedding of 40mm you may need to dig the flags into the mot by 25mm or so or add more once the flags are down.

Weed membrane should go between mot and gravel if you want to use one.
 

DIYnot Local

Staff member

If you need to find a tradesperson to get your job done, please try our local search below, or if you are doing it yourself you can find suppliers local to you.

Select the supplier or trade you require, enter your location to begin your search.


Are you a trade or supplier? You can create your listing free at DIYnot Local

 
Sponsored Links
Back
Top