Oh the irony....I have a sand and gravel quarry just 3-4 miles away. They only deliver with a 21T lorry which would struggle to get in as the turning is tight and the delivery costs are huge. I've 135sqm to gravel probably using their 10-14mm rounded grey stuff. I have a Daxara trailer (1.45m x 1m x 0.4m). If the trailer was filled each load would cover 14.5sqm at 40mm deep. so 10 trips. The volume of the trailer is therefore 0.58 cumecs. Can anyone advise if a full trailer would exceed the recommended max load of 540kg.
What volume are the tonne bags sold by builders merchants approximately, which are probably not an actual tonne?
I don't mind doing the round trips, and with my small trailer I can hopefully push it around the house to tip it where it's needed. If I got a huge load I'd be handballing it from one drop point........
If I did half a trailer it's 20 trips? But I finish work at 2 pm each day so it would only take 2 trips a day for 2 weeks(10 days) to get the stuff, much less of a psychological battle than some huge mound! (or a bit over at 600kg would be 8 days )
What volume are the tonne bags sold by builders merchants approximately, which are probably not an actual tonne?
I don't mind doing the round trips, and with my small trailer I can hopefully push it around the house to tip it where it's needed. If I got a huge load I'd be handballing it from one drop point........
If I did half a trailer it's 20 trips? But I finish work at 2 pm each day so it would only take 2 trips a day for 2 weeks(10 days) to get the stuff, much less of a psychological battle than some huge mound! (or a bit over at 600kg would be 8 days )