As I stated earlier, we have had installation problems with Nibe heat pumps. Poor English translation in the MIs, PCB & wire link problems. In fact, with the several we have installed, I can't think of one that didn't have a minor fault!!
As for Ecoliving don't even consider them!
ive had nightmares with the danfoss units(diplomat from memory),hard to set up and get running to there best effiecency.
As I stated earlier, we have had installation problems with Nibe heat pumps. Poor English translation in the MIs, PCB & wire link problems. In fact, with the several we have installed, I can't think of one that didn't have a minor fault!!
As for Ecoliving don't even consider them!
ive had nightmares with the danfoss units(diplomat from memory),hard to set up and get running to there best effiecency.
Yes, Danfoss did tell us that their units are now 'wrench monkey proof', so I'm sure you'll not have any problems in the future.
lcgs";p="1509685 said:uk gshp units arent anywhere near as good as overseas packages.miles away from the scandanavian ones.
In what way?
I really want to do this once and once only and for the system to see me out....
What is the problem with ecoliving? They are the Nibe retailer around here.
We are about to embark on a new build
What construction method are you using?
If its blockwork cavity then consider 150mm
If you need to find a tradesperson to get your job done, please try our local search below, or if you are doing it yourself you can find suppliers local to you.
Select the supplier or trade you require, enter your location to begin your search.
Are you a trade or supplier? You can create your listing free at DIYnot Local